Monitoring and Operating Plan for C-111 Interim Contruction Project: Final Draft.

Loading the Internet Archive Bookreader, please wait...
Date Issued:
1990
Summary:
The Interim C-111 Plan has evolved from numerous public meetings and comments by interested persons and professional staff of various state and federal agencies. A major focus of concern has been the recurring environmental disturbance associated with removal of the earthen plug at S-197, the terminal outfall for the C-111 canal. Operating criteria for the S-197 structure have also evolved with changing demands throughout the basin. Although this structure was originally constructed by the Corps as a temporary measure to prevent salt water intrusion, flood control demands on the system have required the full outlet capacity of the C-111 canal. Plug removal has occurred due to the necessity to satisfy flood control demands for existing development in South Dade County.
Title: Monitoring and Operating Plan for C-111 Interim Contruction Project: Final Draft.
56 views
Name(s): Worth,Dewey F.
Type of Resource: text
Genre: Technical Report
Issuance: monographic
Date Issued: 1990
Date Issued: 1990
Publisher: South Florida Water Management District (Fla.)
Physical Form: electronic resource
Extent: 1 volume, illustrations,28 cm
Language(s): English
Summary: The Interim C-111 Plan has evolved from numerous public meetings and comments by interested persons and professional staff of various state and federal agencies. A major focus of concern has been the recurring environmental disturbance associated with removal of the earthen plug at S-197, the terminal outfall for the C-111 canal. Operating criteria for the S-197 structure have also evolved with changing demands throughout the basin. Although this structure was originally constructed by the Corps as a temporary measure to prevent salt water intrusion, flood control demands on the system have required the full outlet capacity of the C-111 canal. Plug removal has occurred due to the necessity to satisfy flood control demands for existing development in South Dade County.
Identifier: FI05121903 (IID), 1020007 (digitool), fiu:12879 (fedora), AAB9601QF
Note(s): Electronic reproduction. [Florida] : State University System of Florida, PALMM Project, 2006. Mode of access: World Wide Web. Electronic version created 2006, State University System of Florida.
Subject(s): Environmental monitoring -- Florida -- Miami-Dade County
Flood control -- Florida -- Miami-Dade County
Persistent Link to This Record: http://purl.flvc.org/fcla/tc/feol/FI05121903.pdf
Persistent Link to This Record: http://purl.flvc.org/fcla/tc/feol/FI05121903.jpg
Use and Reproduction: http://rightsstatements.org/vocab/NoC-US/1.0/
Host Institution: FIU