You are here

East Everglades Resource Planning Project: water management requirements for the base and alternative scenarios : element IV. A., tasks 2 and 5.

Loading the Internet Archive Bookreader, please wait...
Date Issued:
1980
Summary:
The purpose of this working paper is to describe the water management requirements of the base and alternative scenarios developed in Tasks 1 and 4 of this work element. While this paper does not address an area-wide "system" for water supply and drainage, it does analyze the impacts of projected residential and agricultural development on existing capabilities. Utilizing a water budget approach, impacts have been quantified on an area-wide basis, however more localized affects on the water resource were addressed where possible.
Title: East Everglades Resource Planning Project: water management requirements for the base and alternative scenarios : element IV. A., tasks 2 and 5.
64 views
Alternative Title: Water management requirements for the base and alternative scenarios: element IV. A., tasks 2 and 5.
Alternative Title: East Everglades Resources Planning Project: water management requirements of the base and alternate scenarios.
Subtitle on cover:: Water Management Requirements of the Base and Alternate Scenarios.
Name(s): Metropolitan Dade County (Fla.) Planning Dept.
South Florida Water Management District (Fla.) Resource Planning Dept.
East Everglades Resources Planning Project
PALMM (Project)
Type of Resource: text
Issuance: monographic
Date Issued: 1980
Publisher: South Florida Water Management District, Resource Planning Dept.
Place of Publication: [Miami, Fla.]
Physical Form: electronic resource
Extent: 25 pages, illustrations; 28 cm.
Language(s): English
Summary: The purpose of this working paper is to describe the water management requirements of the base and alternative scenarios developed in Tasks 1 and 4 of this work element. While this paper does not address an area-wide "system" for water supply and drainage, it does analyze the impacts of projected residential and agricultural development on existing capabilities. Utilizing a water budget approach, impacts have been quantified on an area-wide basis, however more localized affects on the water resource were addressed where possible.
Identifier: FI05030304 (IID), 60786563 (oclc), 1000596 (digitool), fiu:4216 (fedora), AAB8771QF
Note(s): Dade County Planning Dept.
Electronic reproduction. [Florida] : State University System of Florida, PALMM Project, 2005. (Everglades online collection) Mode of access: World Wide Web. System requirements: Internet connectivity; Web browser software; Adobe Acrobat Reader to view and print PDF files. Electronically reproduced by Florida International University from a document held in the Green Library at Florida International University, Miami.
The East Everglades Resources Planning Project has been conducted with financial and technical assistance from the U.S. Environmental Protection Agency under the provisions of Section 208 of the Federal Water Pollution Control Act (P.L. 92-500)
Subject(s): Water-supply -- Florida -- Miami-Dade County -- Management
Water-supply -- Florida -- Broward County -- Management
Watershed management -- Florida -- Miami-Dade County
Watershed management -- Florida -- Broward County
Water consumption -- Florida -- Miami-Dade County
Water consumption -- Florida -- Broward County
Water -- Florida -- Everglades -- Distribution
Persistent Link to This Record: http://purl.flvc.org/fcla/tc/feol/FI05030304.pdf
Persistent Link to This Record: http://purl.flvc.org/fcla/tc/feol/FI05030304.jpg
Use and Reproduction: http://rightsstatements.org/vocab/NoC-US/1.0/
Host Institution: FIU
Has Part:
(OCoLC)60786139
Is Part of Series: Working paper (Metropolitan Dade County (Fla.). Planning Dept.).
Is Part of Series: Everglades online collection.